Drawer-type and fixed-type MCC panels from 63A to 4000A. Form 3b / 4a / 4b separation. Type-tested at CPRI. Every motor on your plant floor, under one roof.

A Motor Control Centre is the backbone of every large process plant. It consolidates starter, protection, and isolation for dozens of motors into a single, maintainable assembly.

63A-4000A
Rating Range
Form 4b
Max Separation
65 kA
Fault Withstand
CPRI
Type Tested
Overview

What is an MCC Panel?

An MCC, Motor Control Centre, is a floor-standing assembly that houses individual motor starter units for multiple motors in a single enclosure.

MCC panels come in two fundamental construction types. In a fixed-type MCC, each starter unit is permanently wired into the enclosure. In a drawer-type (withdrawable) MCC, each starter unit slides into a cassette that can be pulled out under live conditions.

Form segregation determines how well the internal compartments are separated from each other. Form 4b, the highest level under IEC 61439-1, gives each motor unit its own compartment.

Subtech manufactures MCC panels from 63A to 4000A incomer rating, in drawer-type and fixed-type construction, with Form 2b through Form 4b segregation.

Key Benefits

Why this matters for your facility

Drawer-Type Modularity. One Motor Down, Others Running.

Withdrawable drawer units allow a faulted starter to be removed and replaced without shutting down adjacent motors.

Form 4b: Fault in One Unit Stays in One Unit.

Physical barriers between every drawer, the busbar, and cable terminations prevent arc flash from one module propagating to the bus or adjacent feeders.

CPRI Type-Tested at 65 kA.

Our MCC designs are short-circuit tested at CPRI at 50 kA and 65 kA fault levels.

Branded Switchgear. Full BOM Traceability.

Contactors from Schneider, Siemens, ABB, or L&T. Overload relays from the same OEMs.

VFD and Soft-Starter Integration.

VFD outgoing units with input filters, output chokes, and bypass contactor sets are a standard offering.

Profibus / Modbus Integration for Intelligent MCC.

Intelligent MCC variants with motor management relays provide per-motor energy metering and remote start/stop.

Who Uses This

Where Subtech panels are deployed

Pharma and API Plants

GMP-compliant MCC panels for utilities: HVAC drives, cooling tower fans, AHU motors, purified water pump sets.

Water Treatment Plants

UP Jal Nigam and Delhi Jal Board use Subtech MCC panels to control raw water intake pumps, filter backwash pumps, and chemical dosing drives.

Cement and Paper Mills

High-current, high-duty-cycle motor loads in kiln drives, raw mills, and paper machines.

Food Processing and Packaging

SS-304 enclosure option with IP65 rating for wash-down environments.

Refineries and Petrochemical Plants

Ex-zone-compliant outgoing cables, purged and pressurised enclosure options.

Automotive OEMs and Tier-1 Suppliers

Honda Power Products and other automotive OEMs use Subtech MCC panels for press shop, paint shop, and general utility motor control.

Configurations

MCC Panel Configurations

All configurations built to your motor schedule and SLD.

Fixed-Type MCC

63A to 4000A incomer

Permanently wired outgoing units. Most cost-effective for installations where motors can tolerate planned section shutdown for maintenance.

Get quote

Drawer-Type (Withdrawable) MCC

63A to 2500A incomer

Each motor unit in an individual withdrawable cassette. Live removal and replacement without disturbing adjacent motors.

Get quote

Soft-Starter MCC

Up to 630A per outgoing

3-contactor soft-starter bypass units for centrifugal pumps, fans, and compressors.

Get quote

VFD MCC

Up to 500 kW per outgoing

Variable frequency drive outgoing units with input filter, output choke, and bypass contactor set.

Get quote

Intelligent MCC with Profibus / Modbus

Any rating

Motor management relays in each outgoing unit provide per-motor energy metering and remote start/stop over Profibus DP or Modbus RTU to DCS/SCADA.

Get quote
Technical Detail

Technical Specifications

Voltage Rating415V ±10%, 3-phase 4-wire, 50 Hz
Incomer Rating63A to 4000A
Short Circuit Withstand25 / 35 / 50 / 65 kA (CPRI tested)
Internal SeparationForm 2b, 3b, 4a, 4b per IEC 61439-1
ConstructionDrawer-type (withdrawable) or fixed-type
Starter TypesDOL, reversing DOL, star-delta, soft-starter, VFD, auto-transformer
IP RatingIP42 standard; IP54 and IP65 on request
StandardsIS 8623, IEC 61439-1, CPRI type-tested
Why Subtech

What Backs Every MCC We Ship

01

Engineered to Your Motor Schedule

We design from your motor list and SLD.

02

CPRI Type-Tested at 65 kA

Our MCC designs are physically tested at CPRI, not self-certified.

03

Genuine Branded Switchgear

Schneider, Siemens, ABB, or L&T per your specification.

04

Government and PSU Approved

Supplied to UP Jal Nigam, Delhi Jal Board, NTPC, GAIL, DMRC, Indian Railways.

05

Complete Documentation Package

SLD, GA drawing, BOM, wiring schematic, motor schedule, protection relay settings, CPRI certificate.

06

Lifetime Drawing Retention

Original design files retained for every MCC we build.

FAQ

Frequently asked questions

What is the difference between an MCC panel and an LT panel?
An LT panel is a generic term for any low-tension distribution panel. An MCC is a specific type of LT panel where every outgoing unit is a motor starter.
What is a drawer-type MCC and when do I need it?
In a drawer-type (withdrawable) MCC, each motor starter sits in an individual cassette that can be slid out while the rest of the MCC stays live.
What is Form 4b and do I need it for my MCC?
Form 4b is the highest internal separation level per IEC 61439-1. It physically compartmentalises the busbar, every functional unit, and every cable termination from each other.
What is the lead time for an MCC panel?
Fixed-type MCC panels up to 630A incomer: 15-21 working days. Drawer-type MCC or above 630A: 21-35 working days.
Built in Greater Noida · Trusted across India

Ready to spec your motor control centre?

Share your single-line diagram, load list or three months of electricity bills. Our engineers will respond with a custom BOM, quote and delivery schedule within 24 hours.